搜索
Search
Confirm
Cancel
shunyang
Check category
>
>
>
Congratulations to the Huzhou Electric Power Bureau for taking the lead in realizing direct collection of urban power supply voltage

Congratulations to the Huzhou Electric Power Bureau for taking the lead in realizing direct collection of urban power supply voltage

  • Categories:Shunyang News
  • Author:General Manager
  • Origin:
  • Time of issue:2012-11-12
  • Views:

  From the comprehensive news and grid focus column of "Zhejiang Electric Power News" on November 5, we were delighted to read that Huzhou took the lead in realizing direct collection of urban power supply voltage, and Huzhou Electric Power Bureau was the first to realize urban The network power supply voltage is directly collected.
  (State Grid News also reported:http://www.sgcc.com.cn/xwzx/gsyw/yxfc/11/282754.shtml)
  At the beginning of 2012, the Huzhou Electric Power Bureau further standardized the data collection and access of the power supply voltage monitoring device in accordance with the relevant work requirements of the State Grid Corporation and Zhejiang Electric Power Company. Class D statistical voltmeters have been upgraded, adding functions such as wireless transmission and active data upload to the provincial company main station system. By adding these functions, the bureau has realized the city grid power supply voltage data information is directly sent to the provincial company voltage monitoring platform, which fully meets the "two-level deployment and three-level application" of the State Grid Corporation's power supply voltage automatic acquisition system and the Zhejiang company's "Huzhou Electric Power Bureau Urban Network The voltage monitoring data is directly sent to the provincial company unified gateway, and the data is uniformly analyzed to the provincial company voltage monitoring platform database, which will lay the technical foundation for the future of the province’s voltage monitoring data to the provincial company unified gateway. This is the first in Zhejiang Province.

  Due to the realization of direct mining, the timeliness of the information reporting of the power supply voltage qualification rate is further improved, and the lean level of comprehensive power supply voltage management is effectively improved.

  In this project, our company undertook two developments of the interface software to meet the requirements of "direct acquisition"; the transformation of all voltage monitors and automatic collection and reporting of meters and communication technology support. At the beginning of May, the setting and debugging of 327 GPRS voltage monitors were completed. Since most of the monitors have been installed at each monitoring point, our technicians upgraded the interface software at each site, and normal GPRS communication was realized in mid-June 2012. , And then transform and deliver the remaining monitors.

  Since the Huzhou Bureau has to report the voltage data of the provincial company in a unified manner, the directly affiliated Deqing Power Supply Bureau also needs to be modified to upload the data to the provincial company platform. The bureau has already applied our Shunyang WEB voltage qualification rate information management system in 2007, so we have carried out secondary development and improvement to it, and achieved the requirements of the provincial company and the Huzhou bureau.

  After a period of trial operation, we are very pleased with the good news of normal operation.

Copyright © 2020 Ningbo Shunyang Electrical Measurement Instruments Co.,Ltd.  All rights reserved.  浙ICP备05066413号-1   Powered by www.300.cn