搜索
Search
Confirm
Cancel
shunyang
Check category
>
>
>
Our personnel cooperate with the power equipment repair factory to repair the equipment of the municipal power distribution room

Our personnel cooperate with the power equipment repair factory to repair the equipment of the municipal power distribution room

  • Categories:Shunyang News
  • Author:General Manager
  • Origin:
  • Time of issue:2013-10-15
  • Views:

    On the afternoon of October 13, 2013, our company received a call for assistance from the municipal electric power equipment repairing factory, requesting to immediately send personnel to participate in the serious flooding of the equipment in the Yuyao municipal government power distribution room due to the heavy rain brought by Typhoon "Fite". Trouble repair. At this time, our company has not been powered on due to the flood, and the employees are still at home. The company immediately notified three employees to immediately drive in an IVECO car with a new battery pack to support, replace the original battery pack that has been soaked in rainwater, and repair it in the power distribution room with many colleagues from brother units. Until 16:50, our staff completed the battery replacement and line maintenance of the DC power supply equipment, and coordinated with the staff on duty to conduct insulation detection and fault analysis on the leads. In the middle of the night, the repair of the equipment of the workshop colleagues was completed and the electricity was successfully supplied, ensuring the normal power supply of the municipal government.

 

 

 

 

 

Copyright © 2020 Ningbo Shunyang Electrical Measurement Instruments Co.,Ltd.  All rights reserved.  浙ICP备05066413号-1   Powered by www.300.cn